Area/Topic | Bibliography | Background | Hypotheses | Home |
KRIS E. Marin Sonoma: Chart Table Page
Area | Novato and Miller Creeks |
Topic | Sediment: Percent Length of Bank Conditions on Lower Novato Creek 1998 |
Caption: The Chart Table banks_pct_collins1998.xls.db shows reach data collected on Novato Creek in 1998. Data entries show results of field surveys. Data collected and provided by Laurel Collins, Watershed Sciences. The Chart Table shows columns with Reach = reach name, REVETTED = percent length of bank with revetment (right and left banks above and below bankfull combined), STABLE = percent length of bank with stable characteristics (right and left banks above and below bankfull combined), and ERODING = percent length of bank with eroding characteristics, using a threshold of 0.25 ft (right and left banks above and below bankfull combined).
50 rows of a possible 660 have been displayed.
Reach | Revetted | Stable | Eroding |
---|---|---|---|
Stafford Dam | 2 | 58 | 40 |
Bowman | 1 | 61 | 38 |
Sutro Ave | 12 | 52 | 36 |
Novato Blvd | 6 | 62 | 32 |
Las Dias | 14 | 64 | 22 |
Simmons Ln | 18 | 47 | 35 |
Grant Ave | 21 | 48 | 31 |
Seventh St | 19 | 54 | 27 |
www.krisweb.com |